Page 1 of 1

Progress

Posted: Mon May 25, 2009 8:56 pm
by d_harris
Got a number of moggy related jobs done today and I'm rather pleased.

o Radio is now in place, although not wired in yet and speakers not located (job for tomorrow?)
o Unswitched fuse box is now in place
o I know know that the washer pump actually works and I screwed up the wiring :roll: got a mini tank and integral pump on the way anyway now so that will go in soon.
o Rear number plate lamp works again
o Horn needs wiring in again as, again, the horn itself was not at fault
:roll:

Other jobs needed soon;
o Rad needs flushing as the water is looking rather grotty
o check the diff oil level
o engine and gearbox oil change
o Fitting mini washerbottle

All in all I'm quite pleased with how things are with the trav at the moment

Posted: Mon May 25, 2009 9:08 pm
by ASL642
We got quite a bit done on the convertible this weekend. All suspension now on. Brakes bled and checked, recovered the old seat and fitted it and the carpets and trim. Checked it all over for the MOT. The car hasn't driven since 2004 but she purrs along (had to test the brakes) :wink:

Posted: Mon May 25, 2009 9:24 pm
by d_harris
I've only had an afternoon, so not as much progress as you :P

Posted: Mon May 25, 2009 10:03 pm
by Peetee
I've only had an afternoon
And half of that was spent drinking insipid tea and stopping the dog from eating the guinea pigs. :lol:

Posted: Mon May 25, 2009 10:08 pm
by d_harris
Something like that yes! BTW, I think I've found a suitable Y piece on ebay. If I don't need it I'll give you the linky...

Posted: Mon May 25, 2009 11:38 pm
by ASL642
Well you got a lot done with one hand holding the tea mug :lol: