Removed carpet and access panel to gearbox.
Exchanged Clutch pedal and linkage.
Removed all seats
Removed side trim/ rear arm rest in the trav.
Removed B-pillar trim
Welded in Seat belt mounts
Refit seats, carpet, B-pillar trims.
Machine 2mm off the drivers upper door hinge.(move door forward)
Refit drives door several times to get the gaps right and close perfectly.
Underseal front wheel arches.
Tape wiring harness in front wheel arches.
Replace tie rod bushes
Replace upper trunion bushes.
adjust wheel bearing
reset tracking.
Tomorrow I'm planning on changing the gaskets on the tappet covers and drilling a hole in the B-pillar wood for the seat belt pivot to come through. I was hoping to have it all done today so I could take it to the Goodwood breakfast club but I spent too much time on other things,,, buying easter eggs, watching boat race etc..
Here's the car from the last Breakfast Club meet.

