New project WHERE TO START !!!

Discuss Bodywork problems here.
Forum rules
By using this site, you agree to our rules. Please see: Terms of Use
Post Reply
Garym
Minor Friendly
Posts: 35
Joined: Fri Oct 19, 2007 1:22 am
Location: Northumberland
MMOC Member: No

New project WHERE TO START !!!

Post by Garym »

Hi.I have just acquired a 1961 2 door moggie-for free.
It has been standing and off the road since 1986 !
Garaged for 13 years then stood outside for 10 years.
It needs a lot of work,as you can imagine,but I couldn't bear to see it go to the scrapyard.I am going to do the work myself.It needs new floors,sills,crossmember and springhangers.I have done bodywork and mechanics before,but no welding.I have a gasless mig,and I am going to go to night classes in the autumn to learn how to weld.I am determined and looking forward to starting.What is the best plan to tackle the work ? I will down load some photos.
Redmoggy
Minor Fan
Posts: 349
Joined: Mon May 28, 2007 10:32 am
Location: Rolleston N/Z
MMOC Member: No

Post by Redmoggy »

I know its sounds a little premature but as far as the bodywork goes. Make sure the door hinges are good and get the doors fitting correctly. At this stage you can adjust the shell with a porta power or similar. When they fit right brace the door apperture with a substantial piece of steel in the middle and a little further down towards the sill. From here you can start removing the old floor and sills without the body sagging and your doors should still fit nice when you are all done. When you get your new panels spend some time looking at how they go together and look on here for differant ways people put them in. After that i normally work from the middle out only removing as much metal as i have to for each repair. The welding course is a great idea but as many will tell you will not prepare you for the joys of welding on a rusty Minor.
All the best with it.
Rod
LouiseM
Moderator
Moderator
Posts: 4417
Joined: Sat Jan 08, 2005 5:11 pm
Location: London
MMOC Member: No

Post by LouiseM »



Eric - 1971 Traveller
Garym
Minor Friendly
Posts: 35
Joined: Fri Oct 19, 2007 1:22 am
Location: Northumberland
MMOC Member: No

Post by Garym »

Would it be better to remove the engine and gearbox,interior and doors,then roll it onto it's side to do the work,or jack it up and tackle it upright.Or would it be better to weld the new floor and sills in then roll it over to do the spring hangers ?
[sig]7201[/sig]
Redmoggy
Minor Fan
Posts: 349
Joined: Mon May 28, 2007 10:32 am
Location: Rolleston N/Z
MMOC Member: No

Post by Redmoggy »

It is easier to repair the shell with it stripped out and obviously less fire risk. It can be done assembled but a bit of mucking about getting round everything.
As for rolling it thats down to what you find easier. If you have not practised welding upside down then rolling it is a good idea. Make sure it is well braced though.
Rod
Post Reply